Trafalgar Way, Canary Wharf, E14

Trafalgar Way, Canary Wharf, E14

  • Case Study

    Trafalgar Way, Canary Wharf, E14

    A 1 acre site located at the north of the Isle of Dogs within walking distance of Canary Wharf.

 

A contract for the acquisition of the Freehold was exchanged. A detailed planning application was drawn up with MAKE architects and successfully negotiated with the London Borough of Tower Hamlets and the GLA.

A resolution to grant planning permission with a S106 was then obtained.

The scheme consists of 414 residential units in 2 towers of 30 and 35 storeys above a replacement McDonalds restaurant and 2 further retail units.

Further refinements to the planning permission were granted  and the site was sold with the benefit of planning  to Essential Living to be developed and held as a residential rental investment.

 

Trafalgar Way, Canary Wharf, E14
Trafalgar Way, Canary Wharf, E14

 

Back to Case Studies

Dutch Quarter Apartments

Dutch Quarter Apartments, Colchester

  • Case study

    Dutch Quarter Apartments, Colchester

    A BT office building with Permitted Development rights for conversion to 34 residential apartments.

 

A JV with Brooksplace. The site was acquired  with secured consent for 51 apartments and built out over
18 months.

We managed the planning, construction and sale process under the SBLiving brand and then completing the
sale of the freehold.

 

Dutch Quarter Apartments

Dutch Quarter Apartments

Back to Case Studies

Orchard Brook, Long Melford, Suffolk

Orchard Brook, Long Melford, Suffolk

  • Case Study

    Orchard Brook, Long Melford, Suffolk

    A brown-field site located in the picturesque village of Long Melford in Suffolk.

 

We exchanged an unconditional contract to acquire the site from the landowners, a caravan manufacturer  following an unsuccessful appeal by the previous developer, Barratt.

A planning application was secured to deliver a 44 unit, high quality residential scheme and was sold to a developer.

 

Orchard Brook, Long Melford, Suffolk
Orchard Brook, Long Melford, Suffolk

 

Back to Case Studies

Homebridge Manor, Witham, Essex

Homebridge Manor, Witham, Essex

  • Case Study

    Homebridge Manor, Witham, Essex

    An existing listed and unoccupied nursing home with planning for conversion to 14 high quality flats.

 

A JV with Brooksplace, we acquired the site, secured consent to convert to residential and then converted and sold the apartments and freehold of the site.

We managed the planning, construction and sale process under the SBLiving brand.

 

Homebridge Manor, Witham, Essex
Homebridge Manor, Witham, Essex

 

Back to Case Studies

Oriel House, Colchester, Essex

Oriel House, Colchester, Essex

  • Case Study

    Oriel House, Colchester, Essex

    We managed the conversion of an existing vacant office building to create 24 new apartments.

 

We achieved a planning consent for the change of use of the building and led a fixed price construction contract through a 2 stage tender process.

The scheme was built out over 18 months and quickly sold.

The freehold was then sold to an investor the following year.

 

Oriel House, Colchester, Essex
Oriel House, Colchester, Essex

 

Back to Case Studies

Creechurch Street, EC3

Creechurch Street, EC3

  • Case Study

    Creechurch Street, EC3

    An existing block of 12 serviced apartments in need of full refurbishment to bring up to modern competitive standards.

 

We were asked to appraise the asset and to recommend how best to maximise the return from the building for ING’s Lionbrook Property Fund.

The decision was made to undertake a full strip out and refurbishment programme so that the building could be put back into economic use in the shortest possible time-frame.

In order to manage risk, following a competitive bidding process, a management agreement was agreed with GoNative prior to start on site.

We managed the team and full refurbishment works having let the construction contract through a single stage competitive tender process.

The building was handed back on time and has since outperformed expected occupancy and rents.

 

Creechurch Street, EC3
Creechurch Street, EC3

 

Back to Case Studies

College Hill, EC4

College Hill, EC4

  • Case Study

    College Hill, EC4

    A redevelopment of a Grade II listed office building into a 3 unit serviced apartment block.

 

We provided a viability analysis of the best use of this attractive listed office building for CBREi’s Lionbrook Property Fund.

The decision was made to convert the property to residential and SB2 achieved a planning consent for residential use from the City of London.

Subsequently CBREi decided to convert and hold the investment as serviced apartments and we managed the detailed design and construction contract through to completion.

A management agreement for the building was then signed with GoNative  to manage the serviced apartments on behalf of the fund and the flats have proved very popular due to the excellent location and unique setting.

 

College Hill, EC4

College Hill, EC4

 

Back to Case Studies

Paul Street, EC2 – Mixed Use Scheme

Paul Street, EC2 – Mixed Use Scheme

  • Case Study

    Paul Street, EC2 – Mixed Use Scheme

    A brownfield infill site located on Paul Street within walking distance of Broadgate and the City.

 

The long lease of the site was acquired through an option agreement and development agreement with the vendors who own and occupy the adjacent building.

A planning application for a mixed use scheme was submitted to the London Borough of Hackney 9 months after exchange of contracts and a consent was achieved within the statutory 13 week period.

The scheme consists of 9 residential units above 13,000 sq ft of B1 space.

The site was subsequently sold for use as an hotel.

 

Paul Street, EC2 – Mixed Use Scheme

Paul Street, EC2 – Mixed Use Scheme

 

Back to Case Studies

Sumner Road, Peckham, SE15

Sumner Road, Peckham, SE15

  • Case Study

    Sumner Road, Peckham, SE15

    A 0.44 acre site located to the north of Peckham High Street.

 

The Freehold site was acquired unconditionally with the benefit of an outline planning permission for a change of use to residential.

Over a 12 month period, a detailed planning application was drawn up and successfully negotiated with the London Borough of Southwark, culminating in the approval of a reserve matters application with a unilateral undertaking.

The scheme consists of 39 residential units in single 4 storey building.

The sale of the site to London and Quadrant Housing Association was then completed.

 

Sumner Road, Peckham, SE15

Sumner Road, Peckham, SE15

 

Back to Case Studies

St George’s House, Ipswich

St George’s House, Ipswich

  • Case Study

    St George’s House, Ipswich

    The site was acquired in January 2007, comprising 1.20 acres and 30,412 sq ft of existing retail parade.

 

The rational behind the purchase of the site was the attractive existing income stream/yield and future development potential.

A scheme was drawn up to include a 120 bed Premiere Inn Hotel, 36 extra-care apartments and a 15,000 sq ft new retail parade at ground floor level.

Due to the deterioration in market conditions in 2008 the decision was taken to concentrate on a long term hold strategy for the site.

SB2 sold their interest back to their partner.

 

St George’s House, Ipswich

St George’s House, Ipswich

 

Back to Case Studies